Consultation
KGSL are currently holding a public consultation on the proposed Material Changes to the consented KGSP. Supporting information relating to the public consultation can be downloaded here.
Download Public Consultation Documents Here
PEIR Chapter 2 Proposed Development Description
PEIR Chapter 4 EIA Methodology and Consultation
PEIR Chapter 5 Planning and Policy Context
PEIR Chapter 6 Geology and Ground Conditions
PEIR Chapter 7 Hydrology and Flood Risk
PEIR Chapter 9 Noise and Vibration
PEIR Chapter 10 Ecology and Nature Conservation
PEIR Chapter 11 Landscape and Visual Impact Assessment
PEIR Chapter 12 Cultural Heritage
PEIR Chapter 13 Socio economic Characteristics
PEIR Chapter 14 Population and Human Health
PEIR Chapter 15 Major Accidents and Disasters
PEIR Chapter 17 Climate Change and GHG Emissions
PEIR Chapter 18 Cumulative Effects Assessment
PEIR Chapter 19 Securing Mitigation
PEIR Figure 1.2 Consented Development Boundary
PEIR Figure 2.1 General Arrangement showing Main Site DCO Order Limits
PEIR Figure 2.3 General Arrangement Showing Main Site Consented Development vs Proposed Development
PEIR Figure 2.5 Hydrogen Flowlines Proposed Below Ground Limits of Deviation
PEIR Figure 2.6 General Arrangement Showing GPP Area Consented Development vs Proposed Development
PEIR Figure 2.7 Main Equipment Areas
PEIR Figure 2.8 Consented Development Vent vs Proposed Development Flaring
PEIR Figure 2.9 Consented Development GPP Area vs Proposed Development GPP Utility Compound Stores
PEIR Figure 2.10 General Arrangement showing Consented Development NTS vs Proposed Development HAGI
PEIR Figure 2.11 General Arrangement GPP Area Site Roads Consented vs Proposed Development
PEIR Figure 2.13 GPP Area Consented Arrangement vs Proposed Arrangement 33kv Powerlines
PEIR Figure 2.14 Indicative Programme of the Main Construction Activities
PEIR Figure 4.1 EIA Methodology
PEIR Figure 6.1 Geology and Soils Study Area
PEIR Figure 6.3 Site Layout Plan Showing Potential Sources of Contamination and Receptors
PEIR Figure 7.1 Hydrology and Flood Risk Study Area
PEIR Figure 7.2 Surface Water Hydrology
PEIR Figure 7.3 Flood Risk Fluvial
PEIR Figure 7.4 Flood Risk Pluvial A01
PEIR Figure 7.5 Flood Risk Reservoir Inundation A01
PEIR Figure 8.2 Nearest Human Receptors
PEIR Figure 8.3 NO2 Hourly Process Contribution
PEIR Figure 8.4 Nox 24 hour Process Contribution
PEIR Figure 9.1 Noise Sensitive Receptors Noise Monitoring Locations
PEIR Figures 11.1 11.2 and Viewpoint Locations
PEIR Figure 12.1 Cultural Heritage Study Area
PEIR Figure 12.2 Designated and Non designated Assets within 250m
PEIR Figure 12.3 Designated Assets within 1km
PEIR Figure 12.4 Historic Areas
PEIR Appendix 6A Phase 1 ESA For Submission Part 1
PEIR Appendix 6A Phase 1 ESA For Submission Part 2
PEIR Appendix 7A Flood Risk Assessment For Submission
PEIR Appendix 9A Baseline Noise Assessment
PEIR Appendix 10B Great Crested Newt Survey
PEIR Appendix 10E River Condition Assessment
PEIR Appendix 11A Visualisations Part 1
PEIR Appendix 11A Visualisations Part 2
PEIR Appendix 12A Historic Environment Desk Based Assessment
(Coming Soon)
Have Your Say
Pre-application consultation is essential in allowing KGSL to understand and respond to any questions or concerns. Extensive engagement and pre-application consultation was undertaken as part of the original DCO application and the Non-Material Change Application in 2022.
We are holding a public consultation on the proposed Material Changes to the DCO consented in 2017 and on a range of updated environmental information. This will provide the project team with feedback from stakeholders and the community with a further opportunity to speak to the project team and submit feedback.
The public consultation period commences on Thursday 9 October 2025 and closes at 23.59 on Thursday 20 November 2025. There are several ways you can find out more and have your say:
- Attend our Project Information Event at:
De Vere Cranage Estate, Byley Lane,
Holmes Chapel, CW4 8EW on
Wednesday 15 October, 3pm – 7pm - Attend our online Question & Answers session taking place on Wednesday 22 October, 6.30pm (Register here)
- Hard copies of the project documentation are also available for public inspection at the Storengy site at Storengy UK Stublach Site (Gatehouse), King Street, Northwich, Cheshire. CW9 7SE. Opening hours: Monday to Friday: 9:00am-4:00pm.
Next Steps
Following consultation, KGSL will prepare and submit a Consultation Report as part of the DCO application, which will include details of all feedback received and how KGSL has responded. The Material Change Amendment will be submitted to the Planning Inspectorate where there will be a further, 28-day period of consultation when comments can be made directly to the Planning Inspectorate.
A recommendation will then be made by the Planning Inspectorate. The ultimate decision will be made by the Secretary of State for the Department of Energy Security and Net Zero or DESNZ.