Consultation

KGSL are currently holding a public consultation on the proposed Material Changes to the consented KGSP. Supporting information relating to the public consultation can be downloaded here.

Download Public Consultation Documents Here

Preliminary Environmental Information Report Chapters

EISE DGSM PLA 2025 00272 SALT CAVERN STORAGE HYDROGEN INTEGRITY REPORT HYKEUPER MATERIAL CHANGE TO HYDROGEN APPLICATION

PEIR Chapter 1 Introduction

PEIR Chapter 2 Proposed Development Description

PEIR Chapter 3 Alternatives

PEIR Chapter 4 EIA Methodology and Consultation

PEIR Chapter 5 Planning and Policy Context

PEIR Chapter 6 Geology and Ground Conditions

PEIR Chapter 7 Hydrology and Flood Risk

PEIR Chapter 8 Air Quality

PEIR Chapter 9 Noise and Vibration

PEIR Chapter 10 Ecology and Nature Conservation

PEIR Chapter 11 Landscape and Visual Impact Assessment

PEIR Chapter 12 Cultural Heritage

PEIR Chapter 13 Socio economic Characteristics

PEIR Chapter 14 Population and Human Health

PEIR Chapter 15 Major Accidents and Disasters

PEIR Chapter 16 Waste

PEIR Chapter 17 Climate Change and GHG Emissions

PEIR Chapter 18 Cumulative Effects Assessment

PEIR Chapter 19 Securing Mitigation

PEIR Figure 1.1 Site Location

PEIR Figure 1.2 Consented Development Boundary

PEIR Figure 2.1 General Arrangement showing Main Site DCO Order Limits

PEIR Figure 2.2 General Arrangement Showing Main Site Layout Area Consented Development vs Proposed Development

PEIR Figure 2.3 General Arrangement Showing Main Site Consented Development vs Proposed Development

PEIR Figure 2.4 General Arrangement showing Consented Development Gas Pipelines vs Proposed Development Hydrogen Flowlines

PEIR Figure 2.5 Hydrogen Flowlines Proposed Below Ground Limits of Deviation

PEIR Figure 2.6 General Arrangement Showing GPP Area Consented Development vs Proposed Development

PEIR Figure 2.7 Main Equipment Areas

PEIR Figure 2.8 Consented Development Vent vs Proposed Development Flaring

PEIR Figure 2.9 Consented Development GPP Area vs Proposed Development GPP Utility Compound Stores

PEIR Figure 2.10 General Arrangement showing Consented Development NTS vs Proposed Development HAGI

PEIR Figure 2.11 General Arrangement GPP Area Site Roads Consented vs Proposed Development

PEIR Figure 2.12 132kV Sub Station Consented Development Limits of Deviation Vs Proposed Development Limits of Deviation Above Ground

PEIR Figure 2.13 GPP Area Consented Arrangement vs Proposed Arrangement 33kv Powerlines

PEIR Figure 2.14 Indicative Programme of the Main Construction Activities

PEIR Figure 4.1 EIA Methodology

PEIR Figure 6.1 Geology and Soils Study Area

PEIR Figure 6.2 Site Location

PEIR Figure 6.3 Site Layout Plan Showing Potential Sources of Contamination and Receptors

PEIR Figure 7.1 Hydrology and Flood Risk Study Area

PEIR Figure 7.2 Surface Water Hydrology

PEIR Figure 7.3 Flood Risk Fluvial

PEIR Figure 7.4 Flood Risk Pluvial A01

PEIR Figure 7.5 Flood Risk Reservoir Inundation A01

PEIR Figure 8.2 Nearest Human Receptors

PEIR Figure 8.3 NO2 Hourly Process Contribution

PEIR Figure 8.4 Nox 24 hour Process Contribution

PEIR Figure 9.1 Noise Sensitive Receptors Noise Monitoring Locations

PEIR Figures 11.1 11.2 and Viewpoint Locations

PEIR Figure 12.1 Cultural Heritage Study Area

PEIR Figure 12.2 Designated and Non designated Assets within 250m

PEIR Figure 12.3 Designated Assets within 1km

PEIR Figure 12.4 Historic Areas

PEIR Figure 13.1 IMD 2019

PEIR Figure 14.2 IMD 2019

PEIR Appendix 6A Phase 1 ESA For Submission Part 1

PEIR Appendix 6A Phase 1 ESA For Submission Part 2

PEIR Appendix 7A Flood Risk Assessment For Submission

PEIR Appendix 9A Baseline Noise Assessment

PEIR Appendix 10A Desk Study

PEIR Appendix 10B Great Crested Newt Survey

PEIR Appendix 10B Figure 1

PEIR Appendix 10C Bat Survey

PEIR Appendix 10C Figure 1

PEIR Appendix 10E River Condition Assessment

PEIR Appendix 11A Visualisations Part 1

PEIR Appendix 11A Visualisations Part 2

PEIR Appendix 12A Historic Environment Desk Based Assessment

Project Newsletter
Proposal Summary Document
Exhibition Boards

(Coming Soon)

Questionnaire
Non Technical Summary

Have Your Say

Pre-application consultation is essential in allowing KGSL to understand and respond to any questions or concerns. Extensive engagement and pre-application consultation was undertaken as part of the original DCO application and the Non-Material Change Application in 2022. 

We are holding a public consultation on the proposed Material Changes to the DCO consented in 2017 and on a range of updated environmental information. This will provide the project team with feedback from stakeholders and the community with a further opportunity to speak to the project team and submit feedback.

The public consultation period commences on Thursday 9 October 2025 and closes at 23.59 on Thursday 20 November 2025. There are several ways you can find out more and have your say:

  • Attend our Project Information Event at:
    De Vere Cranage Estate, Byley Lane,
    Holmes Chapel, CW4 8EW on
    Wednesday 15 October, 3pm – 7pm
  • Attend our online Question & Answers session taking place on Wednesday 22 October, 6.30pm (Register here)
  • Hard copies of the project documentation are also available for public inspection at the Storengy site at Storengy UK Stublach Site (Gatehouse), King Street, Northwich, Cheshire. CW9 7SE. Opening hours: Monday to Friday: 9:00am-4:00pm.

Next Steps

Following consultation, KGSL will prepare and submit a Consultation Report as part of the DCO application, which will include details of all feedback received and how KGSL has responded. The Material Change Amendment will be submitted to the Planning Inspectorate where there will be a further, 28-day period of consultation when comments can be made directly to the Planning Inspectorate.

A recommendation will then be made by the Planning Inspectorate. The ultimate decision will be made by the Secretary of State for the Department of Energy Security and Net Zero or DESNZ.